Close Menu
AGC NewsAGC News
  • Home
  • News
    • Advocacy
    • Economics
    • Energy & Environment
    • Infrastructure
    • Building
    • Procurement
    • Labor & HR
    • Safety & Health
    • Technology
    • Workforce Development
  • AGC Videos
  • Constructor Magazine
    • Digital Publications
    • Online Exclusives
    • Sponsored Content
  • ConstructorCast
  • News Releases
Latest News

Construction Firms Add 19,000 Jobs in September as Craft Wages Rise to $37.64

November 20, 2025

AGC Testifies on PFAS Before Senate Committee

November 20, 2025

Save the Date: Join Us in Washington for the 2026 TCC Fly-In, May 12–13

November 20, 2025
Search
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
AGC NewsAGC News
  • Home
  • News
    • Advocacy
    • Economics
    • Energy & Environment
    • Infrastructure
    • Building
    • Procurement
    • Labor & HR
    • Safety & Health
    • Technology
    • Workforce Development
  • AGC Videos
  • Constructor Magazine
    • Digital Publications
    • Online Exclusives
    • Sponsored Content
  • ConstructorCast
  • News Releases
AGC NEWSLETTERS
AGC NewsAGC News
Home » EPA Signals Intention to “Veto” Permit Associated with Pebble Mine
Energy & Environment

EPA Signals Intention to “Veto” Permit Associated with Pebble Mine

September 14, 2022Updated:December 12, 2023No Comments1 Min Read
Facebook Twitter LinkedIn Email
Sockeye salmon swimming under trees along the shore of the Adams River, British Columbia, Canada.
Share
Facebook Twitter LinkedIn Email

On September 6, 2022, AGC submitted a letter raising concern about the U.S. Environmental Protection Agency’s (EPA) intent to prohibit and restrict certain areas from disposal sites for the Pebble Mine under the Clean Water Act (CWA) section 404(c)—commonly referred to as EPA’s veto authority.  The permit in question is currently undergoing an administrative appeal following the U.S. Army Corps of Engineers’ denial.  EPA’s preemptive veto of the permit would set a harmful precedent for future projects working through the permitting and/or appeals process and have a chilling effect on infrastructure development.

EPA recently announced that it would continue to evaluate responses to the Pebble Mine notice and extend the period of time it has to either withdraw the proposed determination or prepare a recommended determination.  The agency had extended the initial public comment period and, as of the end of August, had received more than 35,000 comments.  EPA will issue its decision no later than December 2, 2022.

For more information, contact Melinda Tomaino at melinda.tomaino@agc.org.

Building Federal/Heavy Highway Infrastructure Utility
Share. Facebook Twitter LinkedIn Email

Related News

Construction Firms Add 19,000 Jobs in September as Craft Wages Rise to $37.64

November 20, 2025

AGC Testifies on PFAS Before Senate Committee

November 20, 2025

Save the Date: Join Us in Washington for the 2026 TCC Fly-In, May 12–13

November 20, 2025

AGC Testifies on E-Verify System

November 19, 2025
Add A Comment
Leave A Reply Cancel Reply

Latest News

Construction Firms Add 19,000 Jobs in September as Craft Wages Rise to $37.64

November 20, 2025

AGC Testifies on PFAS Before Senate Committee

November 20, 2025

Save the Date: Join Us in Washington for the 2026 TCC Fly-In, May 12–13

November 20, 2025

Your source for AGC news. Find us on social media to learn more about the Associated General Contractors of America.

Connect with us:

Facebook X (Twitter) Instagram YouTube LinkedIn
Search
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
© 2025 Associated General Contractors of America.
  • Home
  • AGC.org
  • Get In Touch
  • Convention
  • Notice of Permission to Use
  • Privacy Policy
  • Antitrust Policy

Type above and press Enter to search. Press Esc to cancel.